Request Form |
|
WINTEK CORPORATION Print, complete and fax to (973) 252-8233. Date _________________ RFQ by _________________ Phone #________________ Proj. Name ______________ Date Quote needed? _________
VACUUM SYSTEM INFORMATION (complete as much as possible) 1) Vessel Size? Total Volume = Ft3 ; Working Volume = Ft3 ; Air Leakage= ___#/hr Req'd. Pump Capacity (Gas Circ. Rate)? _________ SCFM Std. Condenser/Receiver Size? ____Ft2 /____ Gas System Operating Pressure (Suction/Discharge)? ________ / _______ (“HgV, PSIG) 2) Continuous or Batch? Batch Time = Hours 3) Vapors Removed = (ie.: water , 78 lbs per batch or 8 #/hr ) a) , lbs b) , lbs c) , lbs 4) Product Temperature = ( oC , oF ) 5) Coolant = ( water , % Glycol , Brine ) Temperature = ( oC , oF ) 6) Peak Condensing @ ______ ("HgV, Torr) Final Vacuum Required = ( "HgA , Torr ) 7) Materials of Construction : a) Pre-condenser/Receiver = ( CS / Copper tubes , CS / SS tubes, All 304 /316, All 316 ) b) Vacuum System = ( CS / Copper tubes , CS / SS tubes, All 304 /316, All 316 ) 8) Pump Sealant? __________ 9) ASME Requirements ? ( Yes ; No, unless required by Code ) 10) Welded Piping Requirements ? ( Yes, per ASME IX Specs (X-ray?) ; Yes, but no Specs. ; No, use threaded) 11) Motor Classification ? ( TEFC ; XP (Cl.1, Div.1, Gp.D) ; XP (Cl.1, Div.1, Gp. C&D) Options: Starter Panel by Wintek? (Yes ; No) Local ; Remote Voltage: _______________ Pressure control valve for 4-20mA input? (Yes ; No) Cooling Jacket on condensate receiver? (Y ; N ) Insulation: Condensate receiver? (Y ; N) Condenser? (Y ; N ) Automatic condensate isolation? (Yes ; No) Automatic condensate pumpout w/ pnuematic isolation, equilizer,vent, drain and pump? (Yes ; No) Automatic separator pumpout? (Yes ; No) |