RFQ by _________________ Phone #________________
Proj. Name ______________
Date Quote needed? _________
VACUUM SYSTEM INFORMATION (complete as much as possible)
1) Vessel Size? Total Volume = Ft3 ; Working Volume = Ft3 ; Air Leakage= ___#/hr
Req'd. Pump Capacity (Gas Circ. Rate)? _________ SCFM Std. Condenser/Receiver Size? ____Ft2 /____ Gas
System Operating Pressure (Suction/Discharge)? ________ / _______ (“HgV, PSIG)
2) Continuous or Batch? Batch Time = Hours
3) Vapors Removed = (ie.: water , 78 lbs per batch or 8 #/hr )
a) , lbs
b) , lbs
c) , lbs
4) Product Temperature = ( oC , oF )
5) Coolant = ( water , % Glycol , Brine ) Temperature = ( oC , oF )
6) Peak Condensing @ ______ ("HgV, Torr) Final Vacuum Required = ( "HgA , Torr )
7) Materials of Construction :
a) Pre-condenser/Receiver = ( CS / Copper tubes , CS / SS tubes, All 304 /316, All 316 )
b) Vacuum System = ( CS / Copper tubes , CS / SS tubes, All 304 /316, All 316 )
8) Pump Sealant? __________
9) ASME Requirements ? ( Yes ; No, unless required by Code )
10) Welded Piping Requirements ? ( Yes, per ASME IX Specs (X-ray?) ; Yes, but no Specs. ; No, use threaded)
11) Motor Classification ? ( TEFC ; XP (Cl.1, Div.1, Gp.D) ; XP (Cl.1, Div.1, Gp. C&D)
Options:
Starter Panel by Wintek? (Yes ; No) Local ; Remote Voltage: _______________
Pressure control valve for 4-20mA input? (Yes ; No)
Cooling Jacket on condensate receiver? (Y ; N ) Insulation: Condensate receiver? (Y ; N) Condenser? (Y ; N )
Automatic condensate isolation? (Yes ; No)
Automatic condensate pumpout w/ pnuematic isolation, equilizer,vent, drain and pump? (Yes ; No)
Automatic separator pumpout? (Yes ; No)